21.801
1 Scope
The present document specifies rules for the structure and drafting of documents intended to become a 3GPP Technical Specification or Technical Report. These rules are intended to ensure that such documents are drafted in as uniform a manner as is practicable, irrespective of the technical content. The present document...
f193e84844076b4f7262087f58142986
21.801
2 References
The following documents contain provisions which, through reference in this text, constitute provisions of the present document. - References are either specific (identified by date of publication, edition number, version number, etc.) or non‑specific. - For a specific reference, subsequent revisions do not apply. - Fo...
f193e84844076b4f7262087f58142986
21.801
3 Definitions and abbreviations
f193e84844076b4f7262087f58142986
21.801
3.1 Definitions
For the purposes of the present document, the terms and definitions given in 3GPP TR 21.905 [3] and the following apply: informative elements: those elements that provide additional information intended to assist the understanding or use of the 3GPP TS or 3GPP TR instruction: provision that conveys an action to be perf...
f193e84844076b4f7262087f58142986
21.801
3.2 Abbreviations
For the purposes of the present document, the abbreviations given in 3GPP TR 21.905 [3] and the following apply: ICS Implementation Conformance Statement OMML Office Math Markup Langugage PDF Portable Document Format SDL Specification and Description Language TR Technical Report TS Technical Specification TTCN-2 Tree a...
f193e84844076b4f7262087f58142986
21.801
4 General principles
f193e84844076b4f7262087f58142986
21.801
4.1 Objective
The objective of a 3GPP Technical Specification or Technical Report is to define clear and unambiguous provisions in order to facilitate international trade and communication. To achieve this objective, the 3GPP TS or TR shall: - be as complete as necessary within the limits specified by its scope; - be consistent, cle...
f193e84844076b4f7262087f58142986
21.801
4.2 Homogeneity
Uniformity of structure, of style and of terminology shall be maintained not only within each 3GPP TS or 3GPP TR, but also within a series of associated 3GPP TSs or 3GPP TRs. The structure of associated 3GPP TSs or 3GPP TRs and the numbering of their clauses shall, as far as possible, be identical. Analogous wording sh...
f193e84844076b4f7262087f58142986
21.801
4.3 Consistency of 3GPP TSs and 3GPP TRs
In order to achieve the aim of consistency within the complete body of 3GPP TSs and 3GPP TRs, the text of every 3GPP TS and 3GPP TR shall be in accordance with the relevant provisions of existing basic 3GPP TSs and 3GPP TRs. This relates particularly to: - standardized terminology; - principles and methods of terminolo...
f193e84844076b4f7262087f58142986
21.801
4.4 Equivalence of official language versions
3GPP TSs or 3GPP TRs shall be in the English language only.
f193e84844076b4f7262087f58142986
21.801
4.5 Fitness for implementation as a national, regional or international standard
The content of a 3GPP TS or 3GPP TR shall be drawn up in such a way as to facilitate its direct application and its adoption without change as a national, regional or international standard.
f193e84844076b4f7262087f58142986
21.801
4.6 Planning
In order to ensure the timely publication of a 3GPP TS or 3GPP TR or of a series of associated 3GPP TSs or 3GPP TRs, the intended structure and any interrelationships shall be established before detailed drafting begins. In particular, consideration shall be given to the subdivision of the subject matter (see clause 5....
f193e84844076b4f7262087f58142986
21.801
4.7 (void)
f193e84844076b4f7262087f58142986
21.801
4.8 Use of inclusive language
3GPP TSs and TRs should not contain non-inclusive terminology. Terms that have been deemed to fall into this category are listed in Annex K and should be replaced by inclusive terminology. Where a change in terminology would introduce backwards incompatibilities or interoperability issues, a deliverable may contain suc...
f193e84844076b4f7262087f58142986
21.801
5 Structure
f193e84844076b4f7262087f58142986
21.801
5.1 Subdivision of the subject matter
f193e84844076b4f7262087f58142986
21.801
5.1.1 General
3GPP TSs or 3GPP TRs are so diverse that no universally acceptable rules can be established for the subdivision of the subject matter. However, as a general rule, an individual 3GPP TS or 3GPP TR shall be prepared for each subject to be standardized, and published as a complete entity. In specific cases and for practic...
f193e84844076b4f7262087f58142986
21.801
5.1.2 Subdivision of the subject matter within a series of parts
There are two systems in use for subdividing into parts: a) Each part deals with a specific aspect of the subject and can stand alone. b) There are both common and specific aspects to the subject. The common aspects shall be given in part 1. Specific aspects (which may modify or supplement the common aspects and theref...
f193e84844076b4f7262087f58142986
21.801
5.1.3 Subdivision of the subject matter within an individual 3GPP TS or 3GPP TR
Table 2: Example of a typical arrangement of elements in a 3GPP TS or 3GPP TR Type of element Arrangement of elements in 3GPP TS or 3GPP TR (note 1) Permitted content of element(s) in 3GPP TS or 3GPP TR (note 1) Informative preliminary Title pages title, number, logo(s), copyright statement, etc Table of contents (gene...
f193e84844076b4f7262087f58142986
21.801
5.2 Description and numbering of divisions and subdivisions
f193e84844076b4f7262087f58142986
21.801
5.2.1 Parts and sub-parts
The number of a part shall be indicated by arabic numerals, beginning with 1, following the 3GPP TS or 3GPP TR number and preceded by a hyphen, for example: - 3GPP TR 21.999-1, 3GPP TR 21.999-2. 5.2.1A General numbering issues Every attempt shall be made to use continuous numbering as described in the remainder of 5.2....
f193e84844076b4f7262087f58142986
21.801
5.2.2 Clause
The clauses in each 3GPP TS or 3GPP TR or part shall be numbered with arabic numerals, beginning with 1 for the "Scope" clause. The numbering should be continuous, see also clause 5.2.1A. Each clause shall have a title (for formatting see clause 5.2.3).
f193e84844076b4f7262087f58142986
21.801
5.2.3 Subclause
A subclause is a numbered subdivision of a clause. A primary subclause (e.g. subclause 5.1, 5.2, etc.) may be subdivided into secondary subclauses (e.g. subclauses 5.1.1, 5.1.2, etc.) and this process of subdivision may be continued as far as the sixth heading level (e.g. subclause 6.5.4.3.2.1). It is unnecessary to us...
f193e84844076b4f7262087f58142986
21.801
5.2.4 Paragraph
"Hanging paragraphs" such as those shown in the following example shall be avoided since reference to them is ambiguous. EXAMPLE: In the following example, the hanging paragraphs indicated cannot be uniquely identified as being in "clause 5" since strictly speaking the paragraphs in 5.1 and 5.2 are also in clause 5. To...
f193e84844076b4f7262087f58142986
21.801
5.2.5 Lists
Lists may be introduced by a sentence, a complete grammatical proposition followed by a colon, or by the first part of a proposition (without a colon), completed by the items in the list. Each item in a list shall be preceded by a dash. EXAMPLE 1: - list item 1; - list item 2. If necessary for identification, a lower-c...
f193e84844076b4f7262087f58142986
21.801
5.2.6 Annex
Each annex shall start on a new page. Note: This is one of the very few places in a TS or a TR where a manual page break is likely to be legitimate. The skeleton model TS and TR documents contain other page or section breaks, for example at the end of the cover page, before the Contents page, before the Foreword and be...
f193e84844076b4f7262087f58142986
21.801
5.2.7 Bibliography
A bibliography, if present, shall appear after the penultimate annex entitled "Bibliography".
f193e84844076b4f7262087f58142986
21.801
5.2.8 Index
An index, if present, shall appear as the last element. The title shall be "Index". - Use Heading 1 style for the title.
f193e84844076b4f7262087f58142986
21.801
5.2.9 Change history
Shall appear as the last element (informative annex). - Use Heading 8 (for TS) or Heading 9 (for TR) style for the Annex title.
f193e84844076b4f7262087f58142986
21.801
5.3 Consistency amongst Releases
In line with the general provisions of clause 4.2 (homogeneity), it is essential to preserve insofar as possible the structure of a TS or TR from one Release to another. This is particularly important when voiding clauses (or figures, notes, etc) and when adding new clauses (figures, notes, etc). If a new clause is int...
f193e84844076b4f7262087f58142986
21.801
6 Drafting
f193e84844076b4f7262087f58142986
21.801
6.1 Preliminary informative elements
f193e84844076b4f7262087f58142986
21.801
6.1.1 Title page
The title page shall contain the title of the 3GPP TS or 3GPP TR. The wording of the title shall be established by the TSG with the greatest care. While being as concise as possible, it shall indicate, without ambiguity, the subject matter of the 3GPP TS or 3GPP TR in such a way as to distinguish it from that of other ...
f193e84844076b4f7262087f58142986
21.801
6.1.2 Table of contents
The table of contents shall be generated automatically and shall not be set manually. The title shall be "Contents". - Use the TT style for the title. - Use the field {TOC \o} for the table itself. NOTE: The 3GPP Support Team is responsible for the final layout of the table of contents. 6.1.2A (void) 6.1.3 Foreword The...
e7022876aaebc1074115c0f4962825be
21.900
1 Scope
This document outlines the working methods to be used by the 3GPP Technical Specification Groups and their Working Groups and their Sub-Groups, and by the 3GPP Support Team in relation to document management, i.e. handling of specifications, updating procedures, Change Request procedures, version control mechanisms, sp...
e7022876aaebc1074115c0f4962825be
21.900
2 Definitions and abbreviations
For the purposes of the present document, the following terms and those in 3GPP TR 21.905 [2] apply. building block: sub-division of a feature, representing a coherent set of technical functionality which would generally be expected to reside in a single system element. change control: procedure whereby proposed modi...
e7022876aaebc1074115c0f4962825be
21.900
3 General responsibilities of the Support Team
e7022876aaebc1074115c0f4962825be
21.900
3.1 Specifications, meetings and liaisons
The Support Team is responsible for the management of the work of the TSGs. This includes editorship and management of specifications once they have been put under TSG change control. It also includes preparation of and support for the meetings (including meeting reports) of the TSGs and their Working Groups, and subgr...
e7022876aaebc1074115c0f4962825be
21.900
3.2 Registration of code points
In the course of 3GPP's work, it will from time to time be necessary to register code points in protocols maintained by bodies other than 3GPP, for example, Multipurpose Internet Mail Extensions (MIME) types registered with the Internet Assigned Numbers Authority (IANA, http://www.iana.org/). Wherever possible, regist...
e7022876aaebc1074115c0f4962825be
21.900
4 Handling of Specifications
e7022876aaebc1074115c0f4962825be
21.900
4.0 Numbering scheme
The specifications shall be numbered according to the following scheme: 3GPP TS aa.bbb (for Technical Specifications); or 3GPP TR aa.bbb (for Technical Reports). The fields aa and bbb shall be selected according to the nature of the specification as given in tables 1 and 2. The provisions of table 1 shall be strictl...
e7022876aaebc1074115c0f4962825be
21.900
4.1 Overview
Where appropriate, the three-stage methodology defined in ITU‑T Recommendation I.130 should be employed: Stage 1 is an overall service description from the user's standpoint. Stage 2 is an overall description of the organization of the network functions to map service requirements into network capabilities. Stage 3 ...
e7022876aaebc1074115c0f4962825be
21.900
4.1.1 General
A new specification shall be created in a Group. At creation, a rapporteur shall be appointed. The rapporteur shall produce an initial draft, version 0.0.0, and subsequent revised versions (version 0.1.0, possibly 0.1.1, 0.1.2 and so on, then version 0.2.0 etc.). Details of the role of the rapporteur are described in c...
e7022876aaebc1074115c0f4962825be
21.900
4.1.2 Role of the specification rapporteur
The role of the rapporteur is to: - Serve as Editor (following the guidance of the WG) until the specification is placed under change control. - Deliver a clean specification to the MCC for editorial clean-up before submission for TSG approval to come under change control. and, in co-operation with MCC, to: - Revie...
e7022876aaebc1074115c0f4962825be
21.900
4.2 Characteristics of a specification
- The specification has a prime responsible TSG. - The specification may have a prime responsible TSG WG. - The specification may have one or more secondary responsible TSGs and/or TSG WGs. WIDs will express the specific objectives justifying changes to the specification or any other action by any Group with secondar...
e7022876aaebc1074115c0f4962825be
21.900
4.3 Characteristics of a major version of a specification
A major version 0 or 1 or 2 of a specification has the following characteristics: - It is either a draft or withdrawn. - It is TSG internal. A major version w > 2 of a specification has the following characteristics: - It is either under TSG WG Change Control or under TSG Change Control or closed or withdrawn. - I...
e7022876aaebc1074115c0f4962825be
21.900
4.4 Characteristics of a version of a specification
0.x.y - draft (or withdrawn) - TSG internal - no version of the specification has been presented for information to the TSG yet - no major version of the specification is under TSG change control yet 1.0.0 - draft (or withdrawn) - TSG internal - this version 1.0.0 is presented to TSG - for information - or...
e7022876aaebc1074115c0f4962825be
21.900
4.6 Change Request regime
e7022876aaebc1074115c0f4962825be
21.900
4.6.1 Change Requests
Once a specification has been approved by the TSG and version x.0.0 (where x >= 3, corresponding to the Release - see table 4) has been produced, it shall be considered to be under change control. Any technical change which may be identified for inclusion in the specification from this point on shall be accomplished by...
e7022876aaebc1074115c0f4962825be
21.900
4.6.2 Change Request forms
To ensure an appropriate and consistent way of presenting and documenting Change Requests, there exist standardized front covers (forms) for CRs as well as rules on how to accurately identify the modified parts of the specification. The purpose of the CR form itself is to provide the relevant management information of...
e7022876aaebc1074115c0f4962825be
21.900
4.6.3 Contents of Change Requests
Although the CR form shall indicate the details of change, each CR shall have attached the clauses of the specification that are affected by the CR, using the latest version of the major version. These clauses shall have the proposed modifications clearly marked, by means of the word processor's "revision mode". In ca...
e7022876aaebc1074115c0f4962825be
21.900
4.6.4 Handling of the Change Requests
Entry to the TSG WG: A proposed CR should be brought to the relevant Group primarily responsible for the specification concerned and discussed there, before presentation to the TSG. Comments from secondarily responsible Groups (if any) shall have been sought and comments shall have been taken into account before prese...
e7022876aaebc1074115c0f4962825be
21.900
4.6.5 Updating and release of new versions of the specifications
If there is at least one Approved CR to a given specification, a new version number of the specification shall be allocated (see clause 4.2.3), and the Support Team shall produce and issue a new version of the specification.
e7022876aaebc1074115c0f4962825be
21.900
4.6.6 Other changes to specifications
The Support Team may update a specification to correct purely editorial deficiencies brought to its attention. In this case, only the "editorial" field (third digit) of the version number shall be incremented. Such changes should be avoided if possible: normally, they should be held over for inclusion next time a techn...
e7022876aaebc1074115c0f4962825be
21.900
4.10 Release control
e7022876aaebc1074115c0f4962825be
21.900
4.10.1 Creation of a new Release version of a specification
e7022876aaebc1074115c0f4962825be
21.900
4.10.1.0 General
The concept of Releases was introduced in clause 4.0B. A given specification may simultaneously exist in several versions, each corresponding to a different Release. In principle, a Release of the specification can be identified as consisting of all those specifications with a "major" version field of a given value.
e7022876aaebc1074115c0f4962825be
21.900
4.10.1.1 With no technical changes compared to the previous Release
A given Release consists of a set of specifications having a common "major" version field; therefore, for the set of specifications to be complete, a new specification needs to be produced even if its provisions are identical with those of the previous Release's version. The creation of such a specification shall be de...
e7022876aaebc1074115c0f4962825be
21.900
4.10.1.2 When introducing technical changes
A new version of a specification, corresponding to a new Release, shall be prepared when a technical change needs to be introduced to satisfy a requirement of a feature of that new Release. This shall be accomplished by the raising of a Change Request (see clause 4.6) in the usual way, with the version number of the re...
e7022876aaebc1074115c0f4962825be
21.900
4.10.1.3 Specifications not propagated to next Release
Specifications which are not propagated from Release N-1 to Release N in one of the above two methods shall be deemed not to form part of Release N. Under these circumstances, the responsible Group shall undertake a review of all other specifications of Release N to eliminate references to the specification concerned.
e7022876aaebc1074115c0f4962825be
21.900
4.10.2 Mirror Change Requests
When a Group produces a Change Request changing an early Release of a specification, it shall check whether the same change also needs to be made to later Releases of the specification. Changes which are corrective or clarifying in nature will generally be applicable to such other versions. Where it is determined that...
e7022876aaebc1074115c0f4962825be
21.900
4.10.3 Release mechanisms
It is important that the 3GPP release structure provides a sound basis for implementations and equipment interoperation. Key principles important to ensure this are: - A Release shall consist of a well-defined, stable and internally consistent set of functions. - A Release shall be documented in a maintained, consist...
e7022876aaebc1074115c0f4962825be
21.900
4.10.3.1 Corrections to Releases
Each release should be consistent and implementable to ensure interworking. This implies that essential corrections become normative parts of the Release as soon as possible. If essential changes to "old" functionality are made to a new release, similar corresponding changes shall be made to correct the same error in t...
e7022876aaebc1074115c0f4962825be
21.900
4.10.3.2 New features
New functionality shall be included in the latest, non-frozen, Release. New functionality shall not be included in previous, frozen, Releases. To do so would cause incompatibility amongst instantiations of those Releases. This is illustrated in figure A. CR category (see table 4A) Release 1999 Release 4 v3.0.0...
e7022876aaebc1074115c0f4962825be
21.900
4.10.3.3 Release naming
GSM phase 2+ specifications were grouped into annual Releases from 1996 to 1999. The first 3rd generation specifications were grouped into an initial Release 1999. Subsequent Releases are not necessarily annual, and shall be referred to as Release 4, Release 5, etc., according to the major field of the version number ...
e7022876aaebc1074115c0f4962825be
21.900
4.10.3.4 Introduction of features into Releases
Development of the 3GPP system specifications shall be controlled by means of a work plan covering the inclusion of new features (functionality). Target dates for completion of Work Items (see clause 6) shall be estimated by the responsible Groups. Milestones may be defined to monitor the progress of Work Items. Based ...
e7022876aaebc1074115c0f4962825be
21.900
4.10.3.5 Early implementation of features
3GPP may identify certain features as being suitable for "early implementation". The selection of "early implementation" features shall be performed at the TSG level. Additional documentation is provided for early implementation features (see clause 6.4.4). All documentation for early implementation features is conta...
e7022876aaebc1074115c0f4962825be
21.900
5 Availability and distribution of specifications
e7022876aaebc1074115c0f4962825be
21.900
5.1 General
The Support Team shall make all approved versions of all specifications available as soon as possible after their approval (or after approval of CRs thereto) on a file server. The server shall allow anonymous access by any interested party. The Support Team should also endeavour to make earlier drafts available on the...
e7022876aaebc1074115c0f4962825be
21.900
5.2 Choice of availability and distribution of stage 3 specification files
For the availability and distribution of stage 3 specification files (e.g. OpenAPI specification, YANG, ASN.1, XSD, etc.) there are two optional alternatives, described in clauses 5B and 5C, and the principle of how the two alternatives are chosen is decided by the responsible Working Group. Clause 5C applies only for ...
e7022876aaebc1074115c0f4962825be
21.900
6 Work Items
e7022876aaebc1074115c0f4962825be
21.900
6.0 Introduction
e7022876aaebc1074115c0f4962825be
21.900
6.0.1 Introduction: why manage a project?
In any complex engineering venture, it is necessary to plan the project, to monitor its progress, and to be able to determine whether it is being completed on schedule and within budget. In many ways, the concepts and constraints which apply to an engineering project can also be applied to system standardization activi...
e7022876aaebc1074115c0f4962825be
21.900
6.0.2 How to manage a project?
Any project needs to have its goals defined. It is then possible to analyse the steps needed to achieve each goal, starting from the status quo. It will often be desirable to first produce a feasibility report, which is to be undertaken in the context of a Study Item. Study Item: An initial study, resulting in a Te...
e7022876aaebc1074115c0f4962825be
21.900
6.0.3 Types of modification to specifications
The possible modifications of the specifications are basically of different natures: - Error corrections: modifications which correct overlooked errors or inconsistencies in the specifications. - Enhancements: modifications that enhance the system, e.g. by new services or features, or by improving performance or dec...
e7022876aaebc1074115c0f4962825be
21.900
6.1 Creation of a Work Item
When new or enhanced functionality of the 3GPP system is considered desirable an Individual Member of 3GPP (or group thereof) may make a proposal by submitting a Work Item Description (WID) sheet to the relevant TSG or TSG WG: - For new services, features or functions, the TSG responsible for Services and System Aspec...
e7022876aaebc1074115c0f4962825be
21.900
6.2 Types of Work Item
Modifications of the standard could in principle be of two different types: - New services/features/functions that in general affect several specifications and involve several TSGs / WGs; - Technical enhancements or improvements that affect one or a small number of specifications and involve a single or a few Groups ...
e7022876aaebc1074115c0f4962825be
21.900
6.3 Start and continuation of the work and responsibilities
e7022876aaebc1074115c0f4962825be
21.900
6.3.1 General
An early task when elaborating a Work Item is to identify the tasks related to the WI and to allocate them to the TSGs and TSG Sub-Groups. In most cases the tasks from a WI can be split immediately into the following areas: - Service requirements - System/Architectural requirements and implications - Protocol speci...
e7022876aaebc1074115c0f4962825be
21.900
6.3.2 Role of the work item rapporteur
Every Work Item shall have a rapporteur. The rapporteur should be selected from regular attendees of the primary responsible Group and shall be selected from supporting companies. The role of the rapporteur is to: - Monitor the progress of the work in all WGs for the WI. - Report to the responsible WG and produce a r...
e7022876aaebc1074115c0f4962825be
21.900
6.4 Realization of Work Items
e7022876aaebc1074115c0f4962825be
21.900
6.4.1 Planning and categorization of the deliverables (and control thereof)
Planning: An initial time plan should be set up at an early point. As a basis, the time plan should include at least the following points: 1. Presentation for principle agreement of the service requirements; 2. Presentation for principle agreement of the architectural/system implications and requirements; 3. Presen...
e7022876aaebc1074115c0f4962825be
21.900
6.4.2 Choice of deliverables
The SI will be realized as a new Technical Report ("feasibility study report"). The WI will be realized as new specifications and/or amendments to existing specifications; the exact structure lies with the individual TSG Sub-Groups and the TSG. Typically, a new feature may result in at least three completely new speci...
e7022876aaebc1074115c0f4962825be
21.900
6.4.3 Contents of deliverables
e7022876aaebc1074115c0f4962825be
21.900
6.4.3.1 Service requirements
This task, allocated and controlled according to the provisions above, consists in describing in details the aim of the Work Item, as seen by those for which a service is provided, e.g. end users, operators, service providers, etc. In many cases it is desirable that, prior to the actual service requirements specificat...
e7022876aaebc1074115c0f4962825be
21.900
6.4.3.2 Technical realization specifications
These cover both the overall architectural and interface specific detailed specifications. The architectural implications and requirements need to be identified at a very early stage, for the purpose of knowing which parts of the standard (and hence of the system) are affected by a WI, and for the purpose of supporting...
e7022876aaebc1074115c0f4962825be
21.900
6.4.3.3 Test specifications
Changes to the core specifications may have impact on the test specifications. The corresponding changes to test specifications should be approved before publication the new core specifications.
e7022876aaebc1074115c0f4962825be
21.900
6.4.4 Early implementation
The responsible TSG may decide that a particular Work Item is a candidate for "early implementation". If a feature is a candidate for early implementation this shall be indicated in the 3GPP work plan. Where a feature is a candidate for early implementation the deliverables shall include an early implementation Techni...
e7022876aaebc1074115c0f4962825be
21.900
6.4.5 Late completion
If a Feature cannot be completed by the freeze date for a Release, two options are available: 1) If the functionality covered by the late-running work item is considered by the TSG not to be vital to the overall Feature, it may be abandoned, or form part of a later Release. It may be necessary to raise CRs to remove m...
e7022876aaebc1074115c0f4962825be
21.900
6.5 Status tracking of Work Items
The status of each Work Item shall be tracked and recorded throughout its life in the 3GPP work plan. The status may take the following values: Table 6.5a: Status values of Work Item Status Description Indication in work plan Not TSG approved This is a draft Work Item which has not yet been approved by a TSG The...
e7022876aaebc1074115c0f4962825be
21.900
6.6 Work Item model
The model described below can be thought of as a reference model for structuring the work. It is not the intention to rigorously enforce the usage of the model on all ongoing work, but merely to use it as the common reference model across the TSGs and to structure future work. The description below uses TSG SA as an i...
e7022876aaebc1074115c0f4962825be
21.900
6.7 Guidance for Appointed Duties
As part of progressing a work item or other business of 3GPP, delegates may be appointed to roles such as rapporteur, moderator, editor, etc. While operating in these roles, delegates are expected to carry out their assigned duties with impartiality and in the interests of 3GPP. While company support letters are not re...
e7022876aaebc1074115c0f4962825be
21.900
7 Management documents and tools
e7022876aaebc1074115c0f4962825be
21.900
7.0 Overview
This clause summarizes and lists the various permanent or semi-permanent documents (and means of documenting). All these documents/tools are within the responsibilities of the Support Team and or TSG SA.
e7022876aaebc1074115c0f4962825be
21.900
7.1 Status List of Specifications
This list (data base) contains information about all 3GPP specifications, in terms of specification number, title, latest version, rapporteur and other details. The current list shall be annexed to every TSG SA meeting report.
e7022876aaebc1074115c0f4962825be
21.900
7.2 Work Item Status List
This data base contains information about all 3GPP Work Items, in terms of identified future specifications, identified specifications to be amended, supplementary/temporary documentation, expected/planned completion dates and intermediary milestones, and other management information related to specifications, responsi...
e7022876aaebc1074115c0f4962825be
21.900
7.3 Change Request data base
The Change Request data base records all CRs to specifications.
e7022876aaebc1074115c0f4962825be
21.900
7.4 Membership data bases
The members data base contains information of all delegates in the 3GPP TSGs.
e7022876aaebc1074115c0f4962825be
21.900
7.5 Electronic tools used/preferred
For the various types of documents and parts of documents of 3GPP, a minimum variety of word processors etc. should be used. Those identified in 3GPP TR 21.801 [1] are permitted.
e7022876aaebc1074115c0f4962825be
21.900
7.6 WEB and FTP services
The 3GPP website (https://www.3gpp.org) and portal (https://portal.3gpp.org) provide up-to-date information on specification work, such as: meeting calendars, meeting minutes, meeting documents and latest specifications. FTP links to file server areas of each TSG and WG can be found via the 3GPP web pages.