File size: 890 Bytes
1f22857
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Focus on Track 1. Trying to build two full projects in four days will leave you with nothing polished. Here’s your kill-plan for Track 1:

1. **Today (June 6):**

   * Finalize your symptom→ICD mapping module and JSON output.
   * Stand up a minimal Gradio/MCP endpoint locally.

2. **June 7:**

   * Wire up the front-end UI (Gradio space).
   * Hook it into Sonova (or your local HuggingFace‐hosted model) and verify the API calls work.

3. **June 8:**

   * Write README + usage docs.
   * Deploy your Space to HF.

4. **June 9:**

   * End-to-end testing with 5–10 real symptom examples.
   * Polish prompts, confidence scores, and UI copy.

5. **June 10 (morning):**

   * Final sanity check, package, and submit before end of day.

Only if you finish these steps by end of Day 2 should you consider a tiny Track 2 add-on (e.g. a single custom slider). Otherwise nail Track 1.