Dataset Viewer
Auto-converted to Parquet Duplicate
spec_id
string
spec_number
string
spec_type
string
title
string
release
string
clause
string
section_title
string
parent_clause
string
depth
int32
body
string
body_chars
int32
document_order
int32
images
images list
image_hashes
list
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
1
1 Scope
2
## 1 Scope This document outlines the working methods to be used by the 3GPP Technical Specification Groups and their Working Groups and their Sub-Groups, and by the 3GPP Support Team in relation to document management, i.e. handling of specifications, updating procedures, Change Request procedures, version control me...
767
0
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
4.0
Numbering scheme
4
2
## 4.0 Numbering scheme The specifications shall be numbered according to the following scheme: 3GPP TS aa.bbb (for Technical Specifications); or 3GPP TR aa.bbb (for Technical Reports). The fields aa and bbb shall be selected according to the nature of the specification as given in tables 1 and 2. The provisions of...
19,758
1
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
4.0A
Version nomenclature
4
2
## 4.0A Version nomenclature Each specification is associated with a "version number" in the form x.y.z which uniquely identifies the document. The significance of the three fields is defined in table 3. **Table 3: Version number fields** Table 3 shows the estimated degree of stability to be used as a guideline for...
2,738
2
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
4.0B
Releases
4
2
## 4.0B Releases Specifications are grouped into "Releases". A mobile system can be constructed based on the set of all specifications which comprise a given Release. A Release differs from the previous Release by having added functionality introduced as a result of ongoing standardization work within the Groups. Spe...
4,212
3
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
4.10.1
Creation of a new Release version of a specification
4.10
3
### 4.10.1 Creation of a new Release version of a specification ##### 4.10.1.0 General The concept of Releases was introduced in clause 4.0B. A given specification may simultaneously exist in several versions, each corresponding to a different Release. In principle, a Release of the specification can be identified a...
2,411
4
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
4.10.2
Mirror Change Requests
4.10
3
### 4.10.2 Mirror Change Requests When a Group produces a Change Request changing an early Release of a specification, it shall check whether the same change also needs to be made to later Releases of the specification. Changes which are corrective or clarifying in nature will generally be applicable to such other ver...
916
5
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
4.10.3.2
New features
4.10.3
4
#### 4.10.3.2 New features New functionality shall be included in the latest, non-frozen, Release. New functionality shall not be included in previous, frozen, Releases. To do so would cause incompatibility amongst instantiations of those Releases. This is illustrated in figure A. **Table 1** | CR category<br>(see t...
2,057
6
[ "7e1c9b51e067a48cd0fcc9748d8bd8d8" ]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
4.10.3.4
Introduction of features into Releases
4.10.3
4
#### 4.10.3.4 Introduction of features into Releases Development of the 3GPP system specifications shall be controlled by means of a work plan covering the inclusion of new features (functionality). Target dates for completion of Work Items (see [clause 6](../sections/s06_work_items.md)) shall be estimated by the resp...
2,784
7
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
4.10.3
Release mechanisms
4.10
3
### 4.10.3 Release mechanisms It is important that the 3GPP release structure provides a sound basis for implementations and equipment interoperation. Key principles important to ensure this are: - A Release shall consist of a well-defined, stable and internally consistent set of functions. - A Release shall be docum...
2,150
8
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
4.10
Release control
4
2
## 4.10 Release control
24
9
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
4.1.1
General
4.1
3
### 4.1.1 General A new specification shall be created in a Group. At creation, a rapporteur shall be appointed. The rapporteur shall produce an initial draft, version 0.0.0, and subsequent revised versions (version 0.1.0, possibly 0.1.1, 0.1.2 and so on, then version 0.2.0 etc.). Details of the role of the rapporteur...
3,772
10
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
4.1.2
Role of the specification rapporteur
4.1
3
### 4.1.2 Role of the specification rapporteur The role of the rapporteur is to: - Serve as Editor (following the guidance of the WG) until the specification is placed under change control. - Deliver a clean specification to the MCC for editorial clean-up before submission for TSG approval to come under change contro...
691
11
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
4.1
Overview
4
2
## 4.1 Overview Where appropriate, the three-stage methodology defined in ITU-T Recommendation I.130 should be employed: Stage 1 is an overall service description from the user's standpoint. Stage 2 is an overall description of the organization of the network functions to map service requirements into network capabi...
709
12
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
4.2
Characteristics of a specification
4
2
## 4.2 Characteristics of a specification - The specification has a prime responsible TSG. - The specification may have a prime responsible TSG WG. - The specification may have one or more secondary responsible TSGs and/or TSG WGs. WIDs will express the specific objectives justifying changes to the specification or an...
911
13
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
4.3
Characteristics of a major version of a specification
4
2
## 4.3 Characteristics of a major version of a specification A major version 0 or 1 or 2 of a specification has the following characteristics: - It is either a **draft** or **withdrawn**. - It is **TSG internal**. A major version $w > 2$ of a specification has the following characteristics: - It is either **under...
842
14
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
4.4
Characteristics of a version of a specification
4
2
## 4.4 Characteristics of a version of a specification NOTE: In the table above, statements between square brackets are true but not relevant. The first two lines of each row are implied by clause 4.2. **Table 1** | | ...
4,015
15
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
4.5
(void)
4
2
## 4.5 (void)
14
16
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
4.6.1
Change Requests
4.6
3
### 4.6.1 Change Requests Once a specification has been approved by the TSG and version x.0.0 (where x ≥ 3, corresponding to the Release - see table 4) has been produced, it shall be considered to be under change control. Any technical change which may be identified for inclusion in the specification from this point o...
2,663
17
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
4.6.2
Change Request forms
4.6
3
### 4.6.2 Change Request forms To ensure an appropriate and consistent way of presenting and documenting Change Requests, there exist standardized front covers (forms) for CRs as well as rules on how to accurately identify the modified parts of the specification. The purpose of the CR form itself is to provide the re...
7,476
18
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
4.6.3
Contents of Change Requests
4.6
3
### 4.6.3 Contents of Change Requests Although the CR form shall indicate the details of change, each CR shall have attached the clauses of the specification that are affected by the CR, using the latest version of the major version. These clauses shall have the proposed modifications clearly marked, by means of the w...
1,171
19
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
4.6.4
Handling of the Change Requests
4.6
3
### 4.6.4 Handling of the Change Requests #### Entry to the TSG WG: A proposed CR should be brought to the relevant Group primarily responsible for the specification concerned and discussed there, before presentation to the TSG. Comments from secondarily responsible Groups (if any) shall have been sought and comments...
6,653
20
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
4.6
Change Request regime
4
2
## 4.6 Change Request regime
29
21
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
4.8
"Closing" of specifications
4
2
## 4.8 "Closing" of specifications A TSG may decide that a specification will no longer be maintained. That is, no further Change Requests should be considered. The specification remains available, but no further Change Requests should be produced, even corrective ones to align with the equivalent specification of a s...
429
22
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
4.9
"Withdrawing" of specifications
4
2
## 4.9 "Withdrawing" of specifications A TSG may decide to withdraw a specification which is obsolete if its remaining available would confuse implementors (for example, if it contained provisions which were contradictory to provisions of other, later, specifications). Before withdrawing a specification, the TSG shal...
574
23
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
s04_9b_2_diligent_assessment
4.9B.2 Diligent assessment
3
### 4.9B.2 Diligent assessment The decision whether to withdraw (a) specification(s) or whether to remove functionality from within specifications shall only be taken once thorough consideration has been given to the implications and applicability of the action. The withdrawing of a specification or functionality sha...
1,727
24
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
4.9B
Procedure for withdrawing of specifications and functionality
4
2
## 4.9B Procedure for withdrawing of specifications and functionality #### 4.9B.1 (void) #### 4.9B.4 Considerations for ongoing maintenance, enhancement and new Release versions of specifications When a specific version or all versions in a specific Release of a specification, are withdrawn further versions of the...
951
25
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
4
Handling of Specifications
1
# 4 Handling of Specifications ### 4.9A "Withdrawing" of functionality A TSG may decide to withdraw functionality. Before withdrawing functionality, the TSG shall: - raise Change Requests to eliminate any references made to this functionality from any 3GPP specifications; and - move text within specifications which...
445
26
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
5.1
General
5
2
## 5.1 General The Support Team shall make all approved versions of all specifications available as soon as possible after their approval (or after approval of CRs thereto) on a file server. The server shall allow anonymous access by any interested party. The Support Team should also endeavour to make earlier drafts ...
1,386
27
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
5.2
Choice of availability and distribution of stage 3 specification files
5
2
## 5.2 Choice of availability and distribution of stage 3 specification files For the availability and distribution of stage 3 specification files (e.g. OpenAPI specification, YANG, ASN.1, XSD, etc.) there are two optional alternatives, described in clauses 5B and 5C, and the principle of how the two alternatives are...
519
28
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
5
Availability and distribution of specifications
1
# 5 Availability and distribution of specifications
52
29
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
6.0.2
How to manage a project?
6.0
3
### 6.0.2 How to manage a project? Any project needs to have its goals defined. It is then possible to analyse the steps needed to achieve each goal, starting from the status quo. It will often be desirable to first produce a feasibility report, which is to be undertaken in the context of a Study Item. #### **Study ...
5,608
30
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
6.0.3
Types of modification to specifications
6.0
3
### 6.0.3 Types of modification to specifications The possible modifications of the specifications are basically of different natures: - Error corrections: modifications which correct overlooked errors or inconsistencies in the specifications. - Enhancements: modifications that enhance the system, e.g. by new service...
1,455
31
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
6.1
Creation of a Work Item
6
2
## 6.1 Creation of a Work Item When new or enhanced functionality of the 3GPP system is considered desirable an Individual Member of 3GPP (or group thereof) may make a proposal by submitting a Work Item Description (WID) sheet to the relevant TSG or TSG WG: - For new services, features or functions, the TSG responsib...
1,185
32
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
6.2
Types of Work Item
6
2
## 6.2 Types of Work Item Modifications of the standard could in principle be of two different types: - New services/features/functions that in general affect several specifications and involve several TSGs / WGs; - Technical enhancements or improvements that affect one or a small number of specifications and involve...
4,008
33
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
6.3.1
General
6.3
3
### 6.3.1 General An early task when elaborating a Work Item is to identify the tasks related to the WI and to allocate them to the TSGs and TSG Sub-Groups. In most cases the tasks from a WI can be split immediately into the following areas: - Service requirements - System/Architectural requirements and implications...
2,786
34
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
6.3.2
Role of the work item rapporteur
6.3
3
### 6.3.2 Role of the work item rapporteur Every Work Item shall have a rapporteur. The rapporteur should be selected from regular attendees of the primary responsible Group and shall be selected from supporting companies. The role of the rapporteur is to: - Monitor the progress of the work in all WGs for the WI. - R...
598
35
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
6.3
Start and continuation of the work and responsibilities
6
2
## 6.3 Start and continuation of the work and responsibilities
63
36
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
6.4.1
Planning and categorization of the deliverables (and control thereof)
6.4
3
### 6.4.1 Planning and categorization of the deliverables (and control thereof) #### Planning: An initial time plan should be set up at an early point. As a basis, the time plan should include at least the following points: 1. Presentation for principle agreement of the service requirements; 2. Presentation for prin...
1,814
37
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
6.4.2
Choice of deliverables
6.4
3
### 6.4.2 Choice of deliverables The SI will be realized as a new Technical Report ("feasibility study report"). The WI will be realized as new specifications and/or amendments to existing specifications; the exact structure lies with the individual TSG Sub-Groups and the TSG. Typically, a new feature may result in a...
452
38
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
6.4.3.1
Service requirements
6.4.3
4
#### 6.4.3.1 Service requirements This task, allocated and controlled according to the provisions above, consists in describing in details the aim of the Work Item, as seen by those for which a service is provided, e.g. end users, operators, service providers, etc. In many cases it is desirable that, prior to the act...
1,514
39
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
6.4.3.2
Technical realization specifications
6.4.3
4
#### 6.4.3.2 Technical realization specifications These cover both the overall architectural and interface specific detailed specifications. The architectural implications and requirements need to be identified at a very early stage, for the purpose of knowing which parts of the standard (and hence of the system) are ...
705
40
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
6.4.3.3
Test specifications
6.4.3
4
#### 6.4.3.3 Test specifications Changes to the core specifications may have impact on the test specifications. The corresponding changes to test specifications should be approved before publication the new core specifications.
229
41
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
6.4.3
Contents of deliverables
6.4
3
### 6.4.3 Contents of deliverables
35
42
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
6.4.4
Early implementation
6.4
3
### 6.4.4 Early implementation The responsible TSG may decide that a particular Work Item is a candidate for "early implementation". If a feature is a candidate for early implementation this shall be indicated in the 3GPP work plan. Where a feature is a candidate for early implementation the deliverables shall includ...
1,834
43
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
6.4.5
Late completion
6.4
3
### 6.4.5 Late completion If a Feature cannot be completed by the freeze date for a Release, two options are available: - 1) If the functionality covered by the late-running work item is considered by the TSG not to be vital to the overall Feature, it may be abandoned, or form part of a later Release. It may be neces...
1,317
44
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
6.4
Realization of Work Items
6
2
## 6.4 Realization of Work Items
33
45
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
6.5
Status tracking of Work Items
6
2
## 6.5 Status tracking of Work Items The status of each Work Item shall be tracked and recorded throughout its life in the 3GPP work plan. The status may take the following values: **Table 6.5a: Status values of Work Item** **Table 1** | <b>Status</b> | <b>Description</b> ...
2,922
46
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
6.6
Work Item model
6
2
## 6.6 Work Item model The model described below can be thought of as a reference model for structuring the work. It is not the intention to rigorously enforce the usage of the model on all ongoing work, but merely to use it as the common reference model across the TSGs and to structure future work. The description b...
4,304
47
[ "1ad662a678c4f002de911d403f00de8e" ]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
6
Work Items
1
# 6 Work Items ### 6.0 Introduction #### 6.0.1 Introduction: why manage a project? In any complex engineering venture, it is necessary to plan the project, to monitor its progress, and to be able to determine whether it is being completed on schedule and within budget. In many ways, the concepts and constraints wh...
412
48
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
7.1
Status List of Specifications
7
2
## 7.1 Status List of Specifications This list (data base) contains information about all 3GPP specifications, in terms of specification number, title, latest version, rapporteur and other details. The current list shall be annexed to every TSG SA meeting report.
265
49
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
7.2
Work Item Status List
7
2
## 7.2 Work Item Status List This data base contains information about all 3GPP Work Items, in terms of identified future specifications, identified specifications to be amended, supplementary/temporary documentation, expected/planned completion dates and intermediary milestones, and other management information relat...
397
50
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
7.3
Change Request data base
7
2
## 7.3 Change Request data base The Change Request data base records all CRs to specifications.
97
51
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
7.4
Membership data bases
7
2
## 7.4 Membership data bases The members data base contains information of all delegates in the 3GPP TSGs.
108
52
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
7.5
Electronic tools used/preferred
7
2
## 7.5 Electronic tools used/preferred For the various types of documents and parts of documents of 3GPP, a minimum variety of word processors etc. should be used. Those identified in 3GPP TR 21.801 [1]<!-- xref:unresolved 21801 --> are permitted.
249
53
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
7.6
WEB and FTP services
7
2
## 7.6 WEB and FTP services The 3GPP website (<https://www.3gpp.org>) and portal (<https://portal.3gpp.org>) provide up-to-date information on specification work, such as: meeting calendars, meeting minutes, meeting documents and latest specifications. FTP links to file server areas of each TSG and WG can be found via...
341
54
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
7.7
E-mail reflectors
7
2
## 7.7 E-mail reflectors TSGs, WGs and SWGs have their own e-mail lists. There are also several additional lists per topic. Further information can be found on 3GPP web pages.
177
55
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
7
Management documents and tools
1
# 7 Management documents and tools This clause summarizes and lists the various permanent or semi-permanent documents (and means of documenting). All these documents/tools are within the responsibilities of the Support Team and or TSG SA.
241
56
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
8.1
E-mail drafting phase
8
2
## 8.1 E-mail drafting phase An e-mail drafting session can be launched, either on a dedicated exploder list as a cybermeeting or as an informal discussion between interested delegates. Objectives can extend from debating an existing contribution, a Liaison Statement or a Change Request to progressing the service requ...
829
57
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
8.2
E-mail decision declaration
8
2
## 8.2 E-mail decision declaration Authority for an e-mail decision to take place should usually be agreed at plenary meeting. If this is not possible, there shall be a clear notification (i.e. status report) indicating that there will be an e-mail decision. This notification shall be sent on the main mailing lists in...
660
58
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
8.3
Status reporting
8
2
## 8.3 Status reporting During the e-mail decision period, there shall be a clear message stating what the status of each open item is. It is recommended to have a weekly summary of the status of all items, from the previous plenary listing: - the name of the open item; - the name of the responsible delegate; - time ...
517
59
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
8.4
Decision announcement
8
2
## 8.4 Decision announcement When a decision is made (Agreed, rejected, postponed, ...) a clear notification on what has been agreed shall be sent on the main mailing lists of the relevant groups.
198
60
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
8.5
Timing
8
2
## 8.5 Timing E-mail decision procedure should start at the latest 3 weeks before relevant plenary: - the e-mail decision period is two weeks (one status report required); - the procedure shall be completed one week before the relevant TSG, WG or SWG plenary, due to practical arrangements.
293
61
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
8.6
General
8
2
## 8.6 General - in exceptional cases when the procedure cannot be followed a clear notice from Chair is required; - e-mails on mailing lists shall contain a subject with meaningful keywords, e.g. SA1 Tdoc xxx on Charging and/or 22xxx-CR012r4; - if there are no comments during the allowed period, agreement is granted ...
536
62
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
8
E-mail decisions
1
# 8 E-mail decisions WGs may apply e-mail decision procedures for decisions they are entitled to take, as defined by superior bodies (e.g. on specifications, CRs, Liaison statements, etc.). Each WG may set its rules for making e-mail decisions, however, it is required that: - the rules are clearly defined and documen...
529
63
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
9.1
Terminology
9
2
## 9.1 Terminology Written contributions to 3GPP meetings are called "TDocs". NOTE: The term "TDoc" is an abbreviation of "Temporary Document" and is a legacy of when such documents were prepared in paper form. Temporary Documents were not intended to be retained after the end of the meeting at which they were discus...
9,571
64
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
9.2
TDoc status values
9
2
## 9.2 TDoc status values Each TDoc having a formal allocated TDoc number has an associated status chosen from table 9.2-1 below. **Table 9.2-1: TDoc status values** # --- Annex A: Change history **Table 1** | Status value | Meaning ...
35,077
65
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
9
Meeting contribution document types and status values
1
# 9 Meeting contribution document types and status values
58
66
[]
21900
21.900
TR
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Technical Specification Group working methods
Rel-18
5A
File naming conventions
3
### 5A File naming conventions Specifications shall be maintained in the form of computer-based files. The file name shall be of the form aabbb-xyz.eee where: aa and bbb have the same significance as in the specification number (see tables 1 and 2); x, y and z have the same significance as in the version number (s...
10,971
67
[]
End of preview. Expand in Data Studio

3GPP Specifications

938 3GPP technical specifications and reports decomposed into self-contained sections with tables and figures inlined. Pre-validation dataset.

Releases: Rel-18, Rel-19

Usage

from datasets import load_dataset

# Load Rel-18 NR radio specs
ds = load_dataset("GSMA/3GPP", "rel-18", split="38_series")

# Get a specific section
section = ds.filter(lambda r: r["spec_id"] == "38331" and r["clause"] == "5.2.1")[0]
print(section["body"])  # self-contained: tables and figures are inlined

# Reconstruct full spec
spec = ds.filter(lambda r: r["spec_id"] == "38331").sort("document_order")
full_text = "\n\n".join(spec["body"])

# Load Rel-19
ds19 = load_dataset("GSMA/3GPP", "rel-19", split="38_series")

Schema

Column Type Description
spec_id string Spec identifier, e.g. 38331
spec_number string Dotted form, e.g. 38.331
spec_type string TS or TR
title string Full spec title
release string Rel-18 or Rel-19
clause string Section number, e.g. 5.2.1
section_title string Section heading
parent_clause string Parent section, e.g. 5.2
depth int32 Heading depth (1-6)
body string Self-contained markdown (tables/figures inlined)
body_chars int32 Character count
document_order int32 Position within spec
images list[Image] Images referenced in this section
image_hashes list[string] MD5 hashes of images

Original DOCX Files

The original 3GPP Word documents (549 files for Rel-18, 442 files for Rel-19) are available under original/:

original/
  rel-18/
  rel-19/

Filenames follow the 3GPP convention: {spec_id}-{version}[_{part}].docx. Large specs may be split across multiple files (e.g., 38101-1-j10_cover.docx, 38101-1-j10_s00-0504.docx).

Download a single file

from huggingface_hub import hf_hub_download

path = hf_hub_download(
    "GSMA/3GPP",
    "original/rel-18/38331-i00.docx",
    repo_type="dataset",
)

License

See 3GPP Legal Matters.

Downloads last month
752