Spaces:
Running
Running
A newer version of the Gradio SDK is available:
5.33.1
Focus on Track 1. Trying to build two full projects in four days will leave you with nothing polished. Here’s your kill-plan for Track 1:
Today (June 6):
- Finalize your symptom→ICD mapping module and JSON output.
- Stand up a minimal Gradio/MCP endpoint locally.
June 7:
- Wire up the front-end UI (Gradio space).
- Hook it into Sonova (or your local HuggingFace‐hosted model) and verify the API calls work.
June 8:
- Write README + usage docs.
- Deploy your Space to HF.
June 9:
- End-to-end testing with 5–10 real symptom examples.
- Polish prompts, confidence scores, and UI copy.
June 10 (morning):
- Final sanity check, package, and submit before end of day.
Only if you finish these steps by end of Day 2 should you consider a tiny Track 2 add-on (e.g. a single custom slider). Otherwise nail Track 1.